UPGRADE OF HAROUGE SIRTICA PIPELINE CATHODIC PROTECTION SYSTEM
This is an EPIC Contract that included Engineering, material supply, installation, and testing of seven Cathodic protection stations along with the Sirtica Pipeline (about 400 KM).
GENERAL SERVICES AND MAINTENANCE AT TIBISTI FIELD
Performing all general services and maintenance including assisting HOO to arrest pipelines / piping leaks whenever required.
GENERAL SERVICES AND MAINTENANCE AT EN-NAGA FIELD