UPGRADE OF HAROUGE SIRTICA PIPELINE CATHODIC PROTECTION SYSTEM

This is an EPIC Contract that included Engineering, material supply, installation, and testing of seven Cathodic protection stations along with the Sirtica Pipeline (about 400 KM).

harouge 1
harouge 3
GENERAL SERVICES AND MAINTENANCE AT TIBISTI FIELD

Performing all general services and maintenance including assisting HOO to arrest pipelines / piping leaks whenever required.

tibisti 1
tibisti 3
tibisti 2
GENERAL SERVICES AND MAINTENANCE AT EN-NAGA FIELD

Providing a general service, light maintenance for all locations with En-Naga field including and not limited to the required manpower and communication requirement particularly switchboard operators. New CAMP already erected.

elnaga field1